BRAVO Node 1

Deployment Location:
Downstream from Doon Wastewater Treatment Plant Grand River, Kitchener, Ontario, Canada

Water Temperature at Node (C): 


Soil Temperature at Node (C): 


Air Temperature at Node (C): 


Current Conditions: ONLINE


Current Feed: ONLINE since July 2005 underwater position facing downstream, Grand River, Ontario, Canada. (colour day/night IR) with air, water and soil temperature


Significant Observations:

Node 1 LIVE Video


Temperature History



water temperature graph

Video Archive Examples



Installation Location